Transformer Vacuuming Process
“Always committed to serve you with our best service and innovativeness”
Vacuuming the transformer using a Transformer Vacuum Plant
Definition
Before oil filling is started, a final check is made for the tightness of the transformer tank by applying vacuum. When vacuum is applied to a transformer without oil, a leakage test must be carried out to ensure that there are no leaks in the tank which would result in wet air being drawn into the transformer.
Benefit
Using a vacuum in this process eliminate moisture and provides deeper penetration of insulation into transformer cavities.
Uniqueness With Us
We have multiple quality brands of Transformer Vacuum Machine which can suit the need of customer as per their transformer specification and requirement.